| Strut included? |
Strut to be cut by installer? |
Ready to be used out of the box? |
Tools required? |
Loose hardware? |
Time spent in the air? |
Procedure |
Main advantage |
Product Image |
| Rod Lock BOTTOM MOUNT DUCT BRACKETS - A |
No
Strut is not needed |
No
Strut is not needed |
Yes |
Yes, a drill |
Yes, self tapping screws |
Very short amount of time |
| • |
Mount brackets onto air duct |
| • |
Lift air duct onto threaded rods simply by pushing |
| • |
Tighten locknut to disengage Push-to-Install |
| • |
Level air duct |
|
| • |
Very fast |
| • |
Allows prefabrication |
| • |
Safe |
| • |
No strut needed, only 1 reference |
|
 |
| Rod Lock BOTTOM MOUNT DUCT BRACKETS - B |
No
Strut is not needed |
No
Strut is not needed |
Yes |
Yes, a drill |
Yes, self tapping screws |
Very short amount of time |
| • |
Mount brackets onto threaded rod using Push-to-Install* |
| • |
Lift air duct into position* |
| • |
Secure brackets to duct using self-tapping screws |
| • |
Tighten locknut to disengage Push-to-Install & level air duct |
|
| • |
Very fast |
| • |
Allows prefabrication |
| • |
Safe |
| • |
No strut needed, only 1 reference |
|
 |
| Rod Lock STRUT |
| Yes |
No |
Yes |
No |
No |
Very short amount of time |
| • |
Lift air duct onto threaded rods simply by pushing |
| • |
Tighten locknut to disengage Push-to-Install |
| • |
Level air duct |
|
| • |
Very fast |
| • |
Allows prefabrication |
| • |
Safe |
| • |
Strut included, only 1 reference, no loose hardware |
| • |
Ready to be used, out of the box |
| • |
No tool required |
| • |
Available for ½” threaded rods |
|
 |
| Rod Lock TSR |
| Yes |
No |
Yes |
No |
No |
Very short amount of time |
| • |
Telescope TSR to the desired rod-to-rod length & close retainer clip |
| • |
Lift assembly into air and push on to threaded rods |
| • |
Tighten locknut to disengage Push-to-Install |
| • |
Level air duct |
| • |
If needed: Install pipe/conduit onto TSR’s bottom face |
|
| • |
Very fast |
| • |
Allows prefabrication |
| • |
Safe |
| • |
Strut included, only 1 reference, no loose hardware |
| • |
Ready to be used, out of the box |
| • |
No tool required |
| • |
Adjustable length of support |
|
 |
| Rod Lock STRUT NUT |
| No |
Yes |
No |
Yes, 2 wrenches |
No |
Very short amount of time |
| • |
Cut strut to length |
| • |
Install CRL Strut Nuts onto strut (open side up only) |
| • |
Lift air duct onto threaded rods simply by pushing |
| • |
Level rack |
| • |
Tighten Strut Nut & locknut to disengage Push-to-Install |
|
| • |
Very fast |
| • |
Allows prefabrication |
| • |
Safe |
| • |
Quickly build multi-tier trapeze |
| • |
Works with any length of strut |
| • |
Can be repositioned in strut in 2“ increments |
| • |
No loose hardware |
| • |
Height Adjustment |
|
 |
| Rod Lock CHANNEL NUT |
| No |
Yes |
No |
No |
No |
Very short amount of time |
| • |
Cut strut to length |
| • |
Install CRL Channel Nuts onto strut |
| • |
Install leveled SN Nuts or standard hex nuts on threaded rods as stops |
| • |
Lift air duct onto threaded rod simply by pushing up against stops |
| • |
If needed, install another tier using the same method |
|
| • |
Very fast |
| • |
Allows prefabrication |
| • |
Safe |
| • |
Quickly build multi-tier trapeze |
| • |
Works with any length of strut |
| • |
Can be repositioned at any location on strut |
| • |
Can be assembled in to slot for support pipe on bottom and other service on top (Duct) |
| • |
No loose hardware |
|
 |