1. Cut strut to length
2. Install Channel Nuts
3. Install & level SN Nuts on threaded rods
4. Lift air duct onto threaded rods simply by pushing
- Safe (less time in the air)
- Very fast to install
- Ideal for prefabrication
- Open-Side Up & Open-Side Down applications